Fiberglass

Fiberglass parts are easily repairable. They are made in Colonial or Polar white. Black, grey or taupe for an additional $20. Lead time 5-7 business days.

ABS

ABS parts are Polar White. Lead time 3 weeks.

Polyethylene

Tanks are made out of Polyethylene. Lead time 7-10 business days.

Popular Keywords

Other Languages


Mallard 1982
2" drain ident, honeycomb floor, 1/2" foam leveling base, also fits 1991 within 1/4"
ID: #114




Back